Job Report by Scott T, September 2022

Hunter Express out growing their Dandenong facility, looking to achieve their business needs to integrate an advanced automation system, they sourced a site which would allow them to create a purpose-built solution.

Keysborough became the location where they embarked on creating a facility that could adapt to the increasing demands (delivery times, etc.) of the Hunter Express customer base and the growth of the e-commerce sector.

Working alongside FDC Construction & Fitout and in consultation with client side project manager TMX Global, Culprit Security were engaged to design & construct the security systems for Hunter Express Transport.

The original design brief and the desired solutions, required quite some input and consultation between all parties to achieve the suitable solution. As detailed plans became available we gave feedback to the builder and Client on the security implications and offered fresh alternatives that best matched the Client’s requirements. We stayed focused on the client and how they planned to use the new spaces when they were completed.

This was achieved with an Inner Range Integriti Access Control and Alarm system, Wisenet Wave VMS CCTV system and Dahua intercom.
We love Industrial Construction, there’s something about it that really makes us smile. So having the opportunity to be so heavily involved on this project and create a solution that really met the clients needs, left the whole team feeling extremely fulfilled.